Breach and Attack Simulation and Continuous Automated Red-Teaming under CSCRF
- What the master circular requires
- DE.DP.S4 guideline 2 requires MIIs and Qualified REs to deploy CART for continuous automated testing. Guideline 1 separately requires half-yearly red teaming.
- What August 2025 changed
- Clause 6.5 recast the general DE.CM.S3 tooling provision as a recommendation to consider threat simulation and related controls with the IT Committee. It did not amend DE.DP.S4.
- How the matrix handles the distinction
- For MIIs and Qualified REs, the evidence question includes CART deployment and bounded testing. For other REs, record CART evidence where the control was adopted following IT Committee consideration.