- The operating overhead
- Six licences means six renewal negotiations a year, six onboardings, six support relationships to keep warm, and six integration projects to build and then maintain against six roadmaps. None of that appears in a price column, and all of it lands on the same small team.
- The correlation problem
- The products do not correlate with each other. A leaked credential in one console and the exposed host it opens in another are the same finding, and joining them is manual work that has to happen every time. That is the cost most stacks discover in month four, not at signature.
- What that means for the totals
- Implementation fees, priority takedown add-ons and legal escalation all sit on top of the figures above, and every one of them is a real line on a real invoice. The assembled stack costs more than this page shows.
- The multiple
- Covering all six lines this way costs 4.0× to 8.6× what one ShadowMap licence does, which is hard to justify to a finance team.